case studies

Reynolds Business Systems
Reynolds project
reynolds business systems
We've moved to a new location. Our new office utilizes modular walls and high density shelving.
Mercedes-Benz Fort Washington Tire Carou
Reynolds project
Mercedes-Benz Fort Washington
 Mercedes dealer needed more tire storage for two locations.
Ciocca Mini Parts
Reynolds project
ciocca nissan
Ciocca Nissan needed to quickly add parts storage for their new dealership.
Tiger Optics Cleanroom
Reynolds project
equipment manufacturer
Manufacturer of sensitive equipment needed a controlled environment for manufacturing
Clean Room
Reynolds project
pharmaceutical manufacturer
To bring on a new product line, this manufacturer needed a clean room.
HTSS Modular Office
Reynolds project
HTSS
Employment agency needed to convert a large open space into private interview rooms.
PPC Lubricants Modular Office
Reynolds project
PPc lubricants
Lubricant distributor needed additional space to seamlessly integrate with existing structures.
George Fisher Wire Mesh
Reynolds project update
george fisher harvel
Securing open doors at the warehouse to keep things ventilated.
Modular Office
Reynolds project
metal manufacturer
Needed nice office space in the plant to review QC with clients.
Bedlift
Reynolds project
philadelphia hospital
Needed more space and better access to hospital beds.
Allentown Parking Authority Modular Offi
Reynolds project
allentown parking auth
Allentown Parking Authority needed to move staff closer to parking facilities.
Reynolds project update
Savencia Cheese High Density
Reynolds project
savencia cheese
Savencia needed more storage room in their PA and IL plants.
Streamlight Rack
Reynolds project
Streamlight
Streamlight added a 70,000 sq ft warehouse addition to increase production and storage capacity while allowing room for growth.
Reynolds project
High Density Shelving
Reynolds project
Easton Police
Easton Police moved into a new facility and needed evidence and file storage, lockers and weapons storage.
Ciocca Huyndai Mezzanine
Reynolds project
Ciocca Hyundai
Ciocca needed to quickly add more parts storage and fit it within their current space.
Star GMC Parts Mezzanine
Reynolds project
Star buick gmc
Star Buick GMC need more parts storage. A mezzanine platform above existing shelving was the answer.
High Density Shelving
Reynolds project
northampton county archives
The County was out of room for storage and had critical materials to store
High Density Shelving
Reynolds project
olympus
Needed more room in their new facility and saved over 10,000 square feet with their new system
Police Lockers
Reynolds project
lehighton police
Police Chief wanted an organized and professional space for everyone on the force.
Reynolds project
sigal museum
Sigal needed to store a wide variety of materials in their new facility.
Reynolds project
Sterile Storage
john muir medical center
Added 60% more storage capacity in their current space and improved inventory accuracy
Auto Parts Automateion
cochran automotive parts storage
Improve customer convenience, dealership efficiency and appearance. 
sandy police dept
The Sandy Police Department was out of room for property and evidence storage...
Modular Space
alaskan shipping line
Needed space to sleep 30 that could withstand Alaskan seas climate , provide comfort and be quick and easy to install
Reynolds project
hydac facility redesign
Downtime was minimized during a whole facility redesign
Union Hospital
The goal was to reduce cost and increase surgical department efficiency
Reynolds project
Sterile Storage Automation
Florida Hospital
Eliminated surgical kit errors and moved kits closer to the OR
Vertical Lifts
mississippi valley stihl
Needed a solution to implement same day shipping and improve inventory accuracy
carisam ltd. luxury goods distributor
Use existing pallet rack on mobile rails to add much needed space for bulk inventory
Reynolds project
santander - consumer
The Consumer Operations Center needed to store thousands of files in the most efficient manner
Vertical Lifts
deer valley medical center
Found a solution to clearing beds from hallways and having quicker access to beds
High Density Shelving
Reynolds project
st luke's health network
Busy practice needed to locate patient records close to providers and speed retrieval and refiling
Reynolds project
candy manufacturer
Added 65% more storage added to an old factory
High Density Shelving
Reynolds project
santander bank
The bank needed to efficiently consolidate files into one location

products

markets

government contracts

> PA Dept General Services

> COSTARS

> GSA

Contact

610-398-9080

877-515-8500

associations

> AIA

> ISNetwork

> IFMA

> AIIM

> ARMA

> ISDA

> Chamber of Commerce

> GLVADA

> PSHFE

> HFMADV

5402 Chestnut St

Emmaus, PA 18049

  • LinkedIn App Icon
  • YouTube Classic

© Copyright 2017 Reynolds Business Systems, Inc.